Paver patio base compaction question
#1
Member
Thread Starter
Join Date: Jul 2019
Posts: 2
Upvotes: 0
Received 0 Upvotes
on
0 Posts
Paver patio base compaction question
Using 2A gravel for a 6 inch base. 450 sq ft patio. Hard ground underneath, compacted, "refusing" water.
Question : due to different working days I was not able to layout perfect Edge - Edge layers of 3 in of Base to be compacted one after the other. So the base layer is a bit of Patchwork of sections of areas done at different times, but all compacted well, in layers no more than 3 in thick..
in other words, the base is not comprised of completely uniform layers that span the entire patio. It is all compacted very well. Should this cause a problem later with uneven settling even if the compaction was done excessively and completely. The topmost layer was Edge - Edge and levelled well before compaction. Anyone have experience with this?
Question : due to different working days I was not able to layout perfect Edge - Edge layers of 3 in of Base to be compacted one after the other. So the base layer is a bit of Patchwork of sections of areas done at different times, but all compacted well, in layers no more than 3 in thick..
in other words, the base is not comprised of completely uniform layers that span the entire patio. It is all compacted very well. Should this cause a problem later with uneven settling even if the compaction was done excessively and completely. The topmost layer was Edge - Edge and levelled well before compaction. Anyone have experience with this?
#2
It is all compacted very well
#4
Group Moderator
It sounds like you have thought about this more than most folks and are actively NOT trying to cut corners. I think you are good to move onto the next step.