I have a 100 amp panel and would like to upgrade to a higher amp panel. Maybe a 150 or 200 amp panel. Does the Power company have to do anything (besides pulling and reinstalling the meter) or is it just a matter of replacing the cables from the meter to the new panel?

skeeter
 
  #2  
Old 02-23-16, 09:50 AM
ray2047's Avatar
Member
Join Date: Mar 2006
Location: USA
Posts: 29,711
Upvotes: 0
Received 15 Upvotes on 13 Posts
If you have an overhead drop you will usually need to up size the wires that feed the meter socket (the ones that connect to the power company drop), (maybe) the meter socket, and the wires from the meter socket to the panel.
 
  #3  
Old 02-23-16, 10:10 AM
S
Member
Thread Starter
Join Date: Jul 2009
Location: United States
Posts: 221
Upvotes: 0
Received 0 Upvotes on 0 Posts
From the meter to the street and down to the end of the street it's all under ground.
 
  #4  
Old 02-24-16, 11:39 AM
S
Member
Thread Starter
Join Date: Jul 2009
Location: United States
Posts: 221
Upvotes: 0
Received 0 Upvotes on 0 Posts
So having to upgrade to a higher panel will the power company have to pull new heavier cables underground to accommodate a larger panel? Does anyone know a ballpark figure of what that would cost?
 
  #5  
Old 02-24-16, 12:09 PM
A
Member
Join Date: Mar 2010
Location: USA
Posts: 4,523
Upvotes: 0
Received 278 Upvotes on 254 Posts
Call the power company to find out how far you can upgrade the panel and keeping their existing service cable.
 
  #6  
Old 02-24-16, 04:32 PM
CasualJoe's Avatar
Member
Join Date: Jan 2010
Location: United States
Posts: 9,871
Received 185 Upvotes on 166 Posts
From the meter to the street and down to the end of the street it's all under ground.
Most power companies will size their service lateral according to calculated load and not the size of the service. Unless you are adding a significant new load (like all electric heat), the chances are very good that the power company will do nothing except disconnect and reconnect after they get the wiring approval from the AHJ.
 
  #7  
Old 02-24-16, 04:50 PM
pcboss's Avatar
Forum Topic Moderator
Join Date: Jul 2002
Location: Maryland
Posts: 13,976
Received 194 Upvotes on 170 Posts
Before you go wasting money, why do you think you should have a larger service? Are you adding additional large loads or adding an addition?
 
  #8  
Old 02-24-16, 05:26 PM
Handyone's Avatar
Member
Join Date: Aug 2000
Location: U.S.
Posts: 4,807
Upvotes: 0
Received 0 Upvotes on 0 Posts
Around here, and probably in your area, the power company will come out and do a power check up free of charge.
The POCO needs to come out regardless because a work order from them is required to apply for a permit. They will let you know of any fees, maybe there are none.

The permit is usually issued over the counter, around $300 would be a guess.
 
 