Installing new siding -Top gap

We started installing new siding but since it was first time may be we did mistake. As we went up on the top we have a 2 inch gap so full width siding will not fit. What are my options here?
I hope not to take out all the sidings and redo again. Please advise.
Thanks,
S2K
 
  #2  
Old 10-28-16, 02:51 PM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Posts: 27,061
Received 1,910 Upvotes on 1,716 Posts
You always have to rip the top row to whatever width is needed. The amount of overlap will remain the same. You may need to nail a shim to the sheathing if it wont sit at the correct angle without tipping.
 
  #3  
Old 10-28-16, 05:02 PM
J
Member
Join Date: Jan 2011
Location: USA
Posts: 4,463
Received 128 Upvotes on 113 Posts
Got a picture?
The best way in most cases is to install a a piece of under sill ( also called utility trim) inside of the J molding at the top of the wall and use a Snap Lock punch to form locking tabs to lock in the top row of siding.
 
  #4  
Old 10-28-16, 05:27 PM
XSleeper's Avatar
Group Moderator
Join Date: Dec 2004
Posts: 27,061
Received 1,910 Upvotes on 1,716 Posts
What kind of siding are we talking about in the first place? Vinyl? Fiber cement? Cedar clapboard, LP?
 
 